IP Casino Resort

Project Details

ROLE
General Contractor

CONTRACT AMOUNT
$118 Million

OWNER
Imperial Palace Casino

LOCATION
Biloxi, MS

ARCHITECT
Friedmutter Group

COMPLETION
2007

Project Description

Hurricane Katrina decimated the Gulf Coast and the IP Casino Resort was no exception with extensive wind and storm surge damage. Only days after the storm had blown through, reconstruction commenced on this property. Phase I included demolition of storm debris and portions of the building damaged beyond repair. Reconstruction was based on a new modern design. Work included reconstructing the casino, pavilion, Player’s Club, Registration, VIP Registration, retail shops, buffet, valet, baggage and back of house operation offices. Phase I completed on December 22, 2005, less than four months subsequent to Katrina’s devastation. Phase II kicked-off immediately after and included a spa, pool bar, steakhouse restaurant, a fine dining restaurant, a sports bar, casual restaurant, coffee house, a state of the art ultra lounge named Chill. All 48-suites on the top three floors of the hotel tower were also renovated.

Awards

Mississippi Associated Builders and Contractors Merit Award

“We would like to recognize the excellent work and professional attention by RAC in the face of an extremely aggressive design and construction schedule that required constant coordination between all parties.”
Jon Lucas
President / General Manager
IP Hotel & Casino