800.688.4003 Facebook Logo LinkedIn Logo Twitter Logo Instagram Logo YouTube Logo
Northrop Grumman Ship 910016021

Northrop Grumman Systems Gulfport Shipyard Revitalization

Gulfport, Mississippi

DESCRIPTION

Project Details

Client:
Northrop Grumman Ship Systems


Project Size:
266,530 sf

  • Bay 9 Composite Warehouse – A new 31,530 sf climate controlled pre-engineered metal building with a 1,500 sf lean-to used for office space and storage. Project included a rack system with a 1,760 pallet capacity.
  • Bay 2, Bay 5, and Bay 1 Modifications – A 15,000 sf building addition and renovations to the existing 90,000 sf building including mechanical and electrical system upgrades, a 7,500 sf high/turn over bay with a finished elevation of 110 feet, and installation of a 100 ton crane.
  • Deckhouse Assembly Building – A new 110,000 sf structural steel framed metal building along with 365 linear feet of translation tracks, two 200 ton bridge cranes, one 20 ton crane, a 90’x70’ fabric door, and a 90’x60’ fabric door.
  • Resin Storage and QA Lab – An 11,000 sf pre-engineered metal building constructed with an epoxy coated slab for chemical protection. It will include a rack system with a 46 pallet capacity.