W i l s o n   N.   J o n e s   M e d i c a l   C e n t e r
A m b u l a t o r y   C a r e   F a c i l i t y,   M e d i c a l   O f f i c e
B u i l d i n g   a n d   P a r k i n g   G a r a g e
S h e r m a n,  T e x a s



O W N E R

Wilson N. Jones
Medical Center

 



A R C H I T E C T

Sterling Barnett Little, Inc.

D E T A I L S

Wilson Jones Regional Health Systems chose to negotiate with Roy Anderson Corp for this project which consisted of a 5-level, 255,875 sq. ft. parking garage and a 5-story 138,913 sq. ft. medical office building. This two part design-build project is located approximately 60 miles from downtown Dallas.

The medical office building includes an ambulatory care unit, a radiology center, a morgue facility, a pharmacy with a drive-through, food court, and the finish out of all physician offices. This structural steel facility has a brick, burnished block and glass facade.

The 779-car parking garage was built from pre-cast concrete and completed in nine months.

The Parking Garage won an “Award of Merit—Concrete Project” in the Best of Awards for Texas Construction Magazine.

W i l s o n   N.   J o n e s   M e d i c a l   C e n t e r
A m b u l a t o r y   C a r e   F a c i l i t y,   M e d i c a l   O f f i c e
B u i l d i n g   a n d   P a r k i n g   G a r a g e
S h e r m a n,  T e x a s



O W N E R

Wilson N. Jones
Medical Center

 



A R C H I T E C T

Sterling Barnett Little, Inc.

D E T A I L S

Wilson Jones Regional Health Systems chose to negotiate with Roy Anderson Corp for this project which consisted of a 5-level, 255,875 sq. ft. parking garage and a 5-story 138,913 sq. ft. medical office building. This two part design-build project is located approximately 60 miles from downtown Dallas.

The medical office building includes an ambulatory care unit, a radiology center, a morgue facility, a pharmacy with a drive-through, food court, and the finish out of all physician offices. This structural steel facility has a brick, burnished block and glass facade.

The 779-car parking garage was built from pre-cast concrete and completed in nine months.

The Parking Garage won an “Award of Merit—Concrete Project” in the Best of Awards for Texas Construction Magazine.